Process Flow:
1. Preparation
· Place the test product in the corresponding fixture station and enter the required test voltage value on the HMI.
2. Test Product
· Press the button on the table to automatically move the product into the test station along with the fixture, and testing begins.
3. Test Completion
· Passed products display a green light; failed products display a red light.
MCCB Semi-Automatic High Voltage Testing Machine